This website or its third-party tools use cookies which are necessary to its functioning and required to improve your experience. By clicking the consent button, you agree to allow the site to use, collect and/or store cookies.
Please click the consent button to view this website.
I accept
Deny cookies Go Back

Intelligent Management

Deming and Theory of Constraints for CEOs and Executive Teams for the Age of Complexity. Ess3ntial Critical Chain Project Management

  • THE DECALOGUE METHOD
    • The Problem for Every Business
    • The Systemic Solution
    • synchronize competencies
    • How It Works
    • business insight and foresight through systemic cause and effect reasoning
    • Our Education Modules for Systemic Management
  • about us
    • Dr. Domenico Lepore
    • the founders
    • Intelligent Management Success Stories
    • Our Books
    • Clients
    • Expanding Spiral of Positive Systemic Results with Intelligent Management
  • blog & books
    • Blog Theory of Constraints and Deming
    • Our publications
  • ITALIA
  • Contact
You are here: Home / Systems Thinking / How to Predict the Future in Uncertain Times Part 2

Jul 06 2017

How to Predict the Future in Uncertain Times Part 2

Screen Shot 2017-07-06 at 4.20.54 PM

In Part Two of this article on predicting the future with science, we look at the tool from Statistical Process Control that helps us understand behaviour patterns in our processes so we can make more informed decisions.

When is a process predictable?

We say that a process is “predictable”  when it is in a state of  “statistical control”. This means when we measure the process and put the data on a control chart, it oscillates between its natural limits (and complies with some other minor rules).

When a process is in this state, we say it is “predictable” because, if nothing changes, it will continue to oscillate in a predictable manner, between its limits.

IF or WHEN it starts to deviate from the state of statistical stability (its oscillation goes beyond the limits), only at that moment can we say that we detect an “anomaly”, or an extra-ordinary event. Unfortunately, it is only after the fact that we can say that an extra-ordinary event has happened. But at least we have a criterion to sift it out and recognize it as such.

Misleading charts

Below is an example of a “run chart” of a process. It represents the arrival time at the office of an “average” person.

The yellow line is the statistical average of the series of data, and the arrival time oscillates between, more or less, 7.00am and 9.50am. It is a considerably wide range.
If we just look at the series of points, we are led to think that day number 12 and day number 22 are “anomalies” (they are far from the average and they make it look as though “Mr. Average” is late).

This interpretation is a typical mistake we make when we look just at the numbers, without any reference system to give us a meaningful context.

Useful charts

Let’s look at this process in a less naive way. A reference system is provided by Statistical Process Control (SPC) so now we have some context. If we calculate the natural limits of oscillation and we draw them on the chart, this is the result:

The process of  “Mr. Average goes to the office” is in fact IN CONTROL. It oscillates between its natural limits (the limits are CALCULATED, not imposed arbitrarily).
The word “predictability” now takes on a different meaning. The process is in control (it is predictable) because it oscillates between the limits, and we can say it will continue to oscillate between them until “something special” happens.

Let’s look at another process; this is  the process of “Mr. Average’s colleague going to work”. The graphic below shows what that process looks like on a simple “run chart”:

The yellow line is the statistical average of the series of data, and the arrival time oscillates between, more or less, 7.40am and 8.20am. Compared with Mr. Average’s arrival time the range is much more narrow, and it looks more “reliable”.

Unfortunately, we cannot rely on impressions to know that everything is all right. Look what happens when we add the natural limits of oscillation:

The process is “out of control”, which means (according to SPC) that the process is unpredictable.

The implication of this statement is the following. Suppose that the boss of the two employees has to organize a meeting in the morning: he will know that, according to the two different behaviors, Mr. Average is likely to be present at any time after 9.50am. On the other hand, his colleague’s presence would be uncertain because of his unpredictability.

Understanding reality

What is the meaning of all this? People may claim to foresee upcoming extra-ordinary events, and we do not understand how they possess this vision, i.e. this ability to predict or make forecasts. Giving names to the events such as “Black Swans” doesn’t help us very much in understanding reality. For example, we could have used the name “Black Swans” for events 12 and 22 on the run chart of Mr. Average.

What we do know, instead, is that it is impossible to predict “extra-ordinary” events. What we can do is distinguish “noise” from “signal”. This means there is no need to base important choices on our gut feel when we can base them on simple statistics applied to reality. We can avoid crying wolf unnecessarily.

It may be a dream, but if we apply a little science and a modicum of intelligence to the understanding of the world, our future can be so much better.

Dr. Giovanni Siepe

See Part One of this article: How to Predict the Future in Uncertain Times 

Quality, Involvement, Flow

Sign up to our blog here and shift your thinking towards broader, systemic possibilities for yourself and your organization. Intelligent Management provides education and training  on W. Edwards Deming’s management philosophy and the Theory of Constraints  (Decalogue methodology) in North America and Europe.

About the Author

Angela Montgomery Ph.D. is Partner and Co-founder of Intelligent Management and author of the business novel+ website  The Human Constraint . This downloadable novel uses narrative to look at how the Deming approach and the Theory of Constraints can create the organization of the future, based on collaboration, network and social innovation.  She is co-author with Dr. Domenico Lepore, founder, and Dr. Giovanni Siepe of  ‘Quality, Involvement, Flow: The Systemic Organization’  from CRC Press, New York.

Written by angela montgomery · Categorized: Systems Thinking, systems view of the world · Tagged: predict, process behavior, SPC, statistical process control, systems view, W. Edwards Deming

Search Form

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Sign Up For Our Systems View Blog!

Search Form

Recent Posts

  • Companies that Challenge their Limiting Beliefs Can Thrive April 23, 2025
  • A Method for Breakthroughs: The Theory of Constraints March 31, 2025
  • The Biggest Bottleneck that Blindsides Business: Management March 14, 2025
  • Revealing the inner nature of any organization to create a leap in performance February 14, 2025
  • Dealing with Uncertainty in 2025 January 13, 2025
  • Exponential Thinking for Exponential Growth December 1, 2024
  • Why Physics Matters for Managing Organizations Systemically November 17, 2024
  • Addressing the Cognitive Human Constraint in Organizations October 27, 2024
  • Obstacles, Ambition and Getting to the Goal October 10, 2024
  • The Theory of Constraints: Why Words Matter so Much September 27, 2024
  • Can a Systems Approach Prevent Greed? September 12, 2024
  • The Human Constraint that Frees Us August 30, 2024
  • Optimize Your Company for the Digital Age August 22, 2024
  • Beyond Teams: Build a Systemic Organization August 15, 2024
  • A New Generation of Entrepreneurs and Leaders Facing Unprecedented Challenges July 11, 2024

Social Icons

  • LinkedIn
  • Twitter
  • Vimeo

Archives

  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • December 2023
  • November 2023
  • October 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • March 2014
  • February 2014
  • January 2014
  • November 2013
  • October 2013
  • September 2013
  • August 2013
  • March 2013
  • February 2013
  • December 2012
  • November 2012
  • October 2012
  • September 2012
  • August 2012
  • July 2012
  • June 2012
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • December 2011
  • November 2011
  • October 2011
  • September 2011

Recent Posts

  • Companies that Challenge their Limiting Beliefs Can Thrive April 23, 2025
  • A Method for Breakthroughs: The Theory of Constraints March 31, 2025
  • The Biggest Bottleneck that Blindsides Business: Management March 14, 2025
  • Revealing the inner nature of any organization to create a leap in performance February 14, 2025
  • Dealing with Uncertainty in 2025 January 13, 2025

Our Blog

  • Companies that Challenge their Limiting Beliefs Can Thrive
  • A Method for Breakthroughs: The Theory of Constraints
  • The Biggest Bottleneck that Blindsides Business: Management
  • Revealing the inner nature of any organization to create a leap in performance
  • Dealing with Uncertainty in 2025

Recent Posts

  • Companies that Challenge their Limiting Beliefs Can Thrive April 23, 2025
  • A Method for Breakthroughs: The Theory of Constraints March 31, 2025
  • The Biggest Bottleneck that Blindsides Business: Management March 14, 2025
  • Revealing the inner nature of any organization to create a leap in performance February 14, 2025
  • Dealing with Uncertainty in 2025 January 13, 2025

Connect with us on LinkedIn and Twitter

  • LinkedIn
  • Twitter

Sign Up For Our Systems View Blog!

Search Form

  • Home
  • Blog Theory of Constraints and Deming
  • Library
  • How to adopt systemic organization management
  • Knowledge Base for ‘The Human Constraint’
  • Contact Us

© 2025 Intelligent Management Inc. Canada

Privacy Policy