This website or its third-party tools use cookies which are necessary to its functioning and required to improve your experience. By clicking the consent button, you agree to allow the site to use, collect and/or store cookies.
Please click the consent button to view this website.
I accept
Deny cookies Go Back

Intelligent Management

Deming and Theory of Constraints for CEOs and Executive Teams for the Age of Complexity. Ess3ntial Critical Chain Project Management

  • THE DECALOGUE METHOD
    • The Problem for Every Business
    • The Systemic Solution
    • synchronize competencies
    • How It Works
    • business insight and foresight through systemic cause and effect reasoning
    • Our Education Modules for Systemic Management
  • about us
    • Dr. Domenico Lepore
    • the founders
    • Intelligent Management Success Stories
    • Our Books
    • Clients
    • Expanding Spiral of Positive Systemic Results with Intelligent Management
  • blog & books
    • Blog Theory of Constraints and Deming
    • Our publications
  • ITALIA
  • Contact
You are here: Home / Uncategorized / How to Start Building Cooperation for the Digital Future

Jul 05 2018

How to Start Building Cooperation for the Digital Future

Digitization will inevitably lead organizations to shift their way of working in radical ways, especially regarding cooperation. Dr. Domenico Lepore writes here about transforming the enterprise for the digital future.

According to Gartner senior VP Dale Kutnick, digitalization will require:

 business development; the IT department and the product management or engineering team – to work together at an unprecedented level of cooperation”.

How can that  cooperation become possible? How can we start transforming the enterprise for the digital future? Once again, our mantra is overcome silos and you can only do that through systemic management.

To paraphrase Bon Jovi (“You give love a bad name”), two things have been given a bad name for the last several decades to a point that they have become unrecognizable. Both these things are vital for systemic management, the kind that organizations need to foster to thrive in an increasingly digital reality. One is Quality Management and the other is Project Management. 

The Quality of Quality is strained

Quality Management has been dragged almost into oblivion by a nonsensical bureaucratic organization that presides over the issuance and maintenance over what is, at best, a crippling set of guidelines. Yes. We are talking about the ISO system, the chairmanship of which Dr. Deming refused in 1982. He did so because he anticipated not just its scientific fallacies but also the damage it would cause to the development of a genuine culture of continuous improvement (and yes, the bla bla on the vaguely Deming-inspired new standards is just lip service to a mechanism that in essence neither ensures nor promotes real quality in the Deming sense.) When correctly understood and implemented, Quality Management is, and must be, about continuous improvement as a culture and this is the key to continuous innovation.

Project Management is not a technique

Project Management, sadly, is still today exclusively considered as a technique for managing projects. This is so far from the truth. Dr Goldratt in his seminal book ‘Critical Chain’ (1997) provides a whole new perspective on what Project Management is. His Critical Chain (CCPM)  algorithm for managing single and multiple projects is the cornerstone for any meaningful and realistic actionable backdrop for transforming organizations into a systemic whole.

A Gartner report suggests ”Anyone who is working on projects and is concerned about on-time delivery should care about CCPM. Therefore, those who should care include CIOs, PMO leaders, portfolio managers, program managers and project managers.”

As usual, Dr Goldratt takes the issue at hand, in this case managing projects, by looking at the fundamental assumptions that keep organizations stuck in their current way of managing projects (i.e. late, out of specs and over budget). The two fundamental conflicts Dr Goldratt addresses and from which the full Project Management solution stems are the following:

The first is “add protection to the tasks” versus “not add protection to the tasks” and the legitimate needs (green boxes) that underpin this conflict are “complete the project on time” and “promise the client a short lead time”. The blue boxes contain the assumptions (mental models) that create the conflict. The yellow box contains the goal.

The second key conflict in Project Management is “start early” versus “start as late as possible” and the two legitimate needs (green boxes) that underpin this conflict are “finish in time without jeopardizing the Critical Chain” and “save on the costs of inventory”.PM start early start lateInvalidating the assumptions (blue boxes) around these conflicts leads to a whole new way of considering what a project in essence is – the orchestration and management of a finite set of resources to accomplish a multiplicity of activities aimed at maximizing revenues of an organization in a given time period.

Critical Chain: the key to managing systemically

Critical Chain is a radically different and radically more successful approach to Project Management. It overcomes why most projects fail by working with the finite capacity of resources, eliminating milestones, multitasking and protecting the entire project, not individual tasks, from variation through the project buffer. In this way the execution of projects becomes vastly more stable, predictable and reliable.  The basic steps for the paradigm of systemic project management that enable us to overcome the two conflicts described above as per the Critical Chain method are the following:

      • create the network:
      • List the project tasks
      • Put the tasks into  sequence highlighting the logical  dependencies among them
      • finite capacity: identify resources and their availability
      • estimate the duration of every single task, calculating that the resource(s) work in a dedicated way, without multitasking
      • identify the Critical Chain (longest chain of dependent events once resource availability has been taken into account). This provides a realistic estimate of the project duration given the resources.
      • insert the project buffer (protects the entire Critical Chain)
      • insert feeding buffers (protect non-critical branches)

In our last post we showed the diagram below that illustrates the systemic model of an organization. It is a model that removes silos and replaces them with processes and projects that require and foster cooperation instead of vertical command and control.

choked tube

How do we implement this model and bring it to life? How do we transform the enterprise for the digital future? By making Quality Management, i.e. continuous improvement, the heart of the enterprise and Critical Chain Project Management the nervous system that connects everything together.

Intelligent Management, founded by  Dr. Domenico Lepore, are trusted advisors to leaders of organizations with their unique Network of Projects organization design. We blog about how to shift your thinking towards broader, systemic possibilities for yourself and your organization. Sign up to our blog here. Intelligent Management provides education and training  on systemic management, W. Edwards Deming’s management philosophy and the Theory of Constraints  (Decalogue methodology) in North America and Europe.

See our new books  The Human Constraint – a business novel that has sold in 27 countries so far and  ‘Quality, Involvement, Flow: The Systemic Organization’  from CRC Press, New York, by Dr. Domenico Lepore,  Dr. .Angela Montgomery and Dr. Giovanni Siepe.

Written by angela montgomery · Categorized: Uncategorized

Search Form

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Sign Up For Our Systems View Blog!

Search Form

Recent Posts

  • Companies that Challenge their Limiting Beliefs Can Thrive April 23, 2025
  • A Method for Breakthroughs: The Theory of Constraints March 31, 2025
  • The Biggest Bottleneck that Blindsides Business: Management March 14, 2025
  • Revealing the inner nature of any organization to create a leap in performance February 14, 2025
  • Dealing with Uncertainty in 2025 January 13, 2025
  • Exponential Thinking for Exponential Growth December 1, 2024
  • Why Physics Matters for Managing Organizations Systemically November 17, 2024
  • Addressing the Cognitive Human Constraint in Organizations October 27, 2024
  • Obstacles, Ambition and Getting to the Goal October 10, 2024
  • The Theory of Constraints: Why Words Matter so Much September 27, 2024
  • Can a Systems Approach Prevent Greed? September 12, 2024
  • The Human Constraint that Frees Us August 30, 2024
  • Optimize Your Company for the Digital Age August 22, 2024
  • Beyond Teams: Build a Systemic Organization August 15, 2024
  • A New Generation of Entrepreneurs and Leaders Facing Unprecedented Challenges July 11, 2024

Social Icons

  • LinkedIn
  • Twitter
  • Vimeo

Archives

  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • December 2023
  • November 2023
  • October 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • March 2014
  • February 2014
  • January 2014
  • November 2013
  • October 2013
  • September 2013
  • August 2013
  • March 2013
  • February 2013
  • December 2012
  • November 2012
  • October 2012
  • September 2012
  • August 2012
  • July 2012
  • June 2012
  • May 2012
  • April 2012
  • March 2012
  • February 2012
  • January 2012
  • December 2011
  • November 2011
  • October 2011
  • September 2011

Recent Posts

  • Companies that Challenge their Limiting Beliefs Can Thrive April 23, 2025
  • A Method for Breakthroughs: The Theory of Constraints March 31, 2025
  • The Biggest Bottleneck that Blindsides Business: Management March 14, 2025
  • Revealing the inner nature of any organization to create a leap in performance February 14, 2025
  • Dealing with Uncertainty in 2025 January 13, 2025

Our Blog

  • Companies that Challenge their Limiting Beliefs Can Thrive
  • A Method for Breakthroughs: The Theory of Constraints
  • The Biggest Bottleneck that Blindsides Business: Management
  • Revealing the inner nature of any organization to create a leap in performance
  • Dealing with Uncertainty in 2025

Recent Posts

  • Companies that Challenge their Limiting Beliefs Can Thrive April 23, 2025
  • A Method for Breakthroughs: The Theory of Constraints March 31, 2025
  • The Biggest Bottleneck that Blindsides Business: Management March 14, 2025
  • Revealing the inner nature of any organization to create a leap in performance February 14, 2025
  • Dealing with Uncertainty in 2025 January 13, 2025

Connect with us on LinkedIn and Twitter

  • LinkedIn
  • Twitter

Sign Up For Our Systems View Blog!

Search Form

  • Home
  • Blog Theory of Constraints and Deming
  • Library
  • How to adopt systemic organization management
  • Knowledge Base for ‘The Human Constraint’
  • Contact Us

© 2025 Intelligent Management Inc. Canada

Privacy Policy